Q.How to write a quality control checklist for your proposed final year project ?
Quality control checklist:->
SoftwareFunction/
Software Attributes
|
Yes
|
No
|
N/A
|
Comments
|
1. Have all the
business software functions been
identified?
|
Yes
|
Application
is ready to use.
|
||
2. Does the
sponsor/user agree that these are
the appropriate software functions?
|
Yes
|
Beta
version will release soon.
Depending upon that require changes will be made.
|
||
3. Is the software
function identified by a commonly
used name?
|
Yes
|
Functions
are made more transparent to user so as to feel easiness while using it.
|
||
4.
Are all the software functions described?
|
No
|
|||
5. Have the
criteria for evaluating the software functions
been identified?
|
Yes
|
Functions
are developed in such a way that user can use it efficiently
|
||
6. Are the
evaluation criteria measurable?
|
No
|
|||
7. Has the
structure addressed:
Reliability?
Efficiency?
Integrity?
Usability?
Maintainability?
Testability?
Flexibility?
Portability?
Reusability?
Interoperability?
|
Yes
|
Testing
aspects are almost addressed to these functionalities only.
|
||
8. Have the
criteria for each structural attribute been stated?
|
No
|
|||
Work Papers on
Tests to Be Conducted
|
||||
1. Has the test
been named?
|
Yes
|
Testing
list is planned first which mainly includes,
1.Functionality
testing
2.Performance
testing
3.Usablity
testing
4.Interface
testing
5.Compatibility
testing
|
||
2. Has the test
been given unique identifying number?
|
No
|
|||
3.Has the test
objective been stated clearly and distinctly?
|
Yes
|
Tests
are structured as,
a.
Test Objectives
b.
Actions Performed
|
||
4. Are the tests
appropriate to evaluate the functions defined?
|
Yes
|
Tests
are planned according to the application developed
|
||
5. Is the level of
detail on the document adequate for creating actual test conditions once the
system is implemented?
|
Yes
|
|||
6. Are the
verification tests directed at project products?
|
Yes
|
Verification
tests are performed in order to evaluate real-time performance of application
that’s developed
|
||
7.Has the purpose
of the verification test been stated?
|
Yes
|
Of
course, its mandatory one.
|
||
8. Has the sequence
in which each online test will be performed been identified?
|
Yes
|
Sequential
test procedures are followed.
|
||
9. Has the name for
each test been included
(optional)?
|
Yes
|
Its
mandatory.
|
||
Administrative
Work
Papers
|
||||
1. Has a work paper
been prepared for each test milestone?
|
Yes
|
Tests
are planned to be performed in sequential order.
|
||
2. Has the date for
starting the testing been identified?
|
Yes
|
Its
almost at start of UI designing
|
||
3. Has the date for
starting test team training been
identified?
|
Yes
|
Its
almost at start of UI designing
|
||
4. Has the date for
collecting the testing material been
identified?
|
Yes
|
|||
5. Has the
concluding date of the test been identified?
|
No
|
|||
6.Have the
equipment requirements for the test been identified?
|
Yes
|
Tests
are first listed and then tools are identified.
|
||
7.Have the software
and documents needed for
conducting the test been
identified?
|
Yes
|
As
per requirements tools are identified
|
||
8.Has the software
to be tested been identified?
|
Yes
|
|||
9.Has the test
input been defined?
|
Yes
|
In
integration testing ,a whole web application been considered as input.
|
||
10.Have the needed
test tools been identified?
|
Yes
|
As
per requirements and usefulness of tools are identified
|
||
11.Has the type of
training that needs to be conducted been defined?
|
No
|
|||
12.Has a test
summary been described?
|
Yes
|
Summary
gives a overview of whole plan
|
||
13.Does this
summary indicate which software is to be included in the test?
|
Yes
|
|||
14.Does the summary
indicate the general approach to testing?
|
Yes
|
General
details are given in test summaries.
|
||
15.Are the test
tools complete?
|
No
|
Test
tools generally are developed in order to provide checking out functionality
of single module for which it has been developed.Its doesn’t applicable to
whole application which includes number of modules of different operability
functions
|
||
16.Has the extent
of testing been defined?
|
No
|
|||
Test Milestones
Work Paper
|
||||
1. Has the start
date of testing been defined?
|
Yes
|
They
are defined at time of test planning.
|
||
2. Are all the test
tasks defined?
|
Yes
|
|||
3.Are the start and
stop dates for each test indicated?
|
Yes
|
|||
4.Is the amount of
time allotted for each task sufficient to perform the task?
|
No
|
As
testing if done with third-party devices,it would require to be performed again manually,as tools doesn’t provide high accuracy.
|
I think this is a very nice article!, thank you for sharing this article guys!
ReplyDeleteIDN Poker
Pastipoker